The invention discloses a post-added steel structure interlayer construction tool and an application method thereof. The post-added steel structure interlayer construction tool comprises an extension hanging rod; the extending suspender comprises a suspender balance weight part and a suspender inner construction part, a balance weight lifting lug is arranged on the lower side of the free end of the suspender balance weight part, a balance weight electric hoist used for lifting a balance weight is hung below the balance weight lifting lug, and an inner construction lifting lug is arranged on the lower side of the free end of the suspender inner construction part. And a to-be-hoisted piece is hung on the inner construction lifting lug through the inner construction lifting rope. The application method comprises the following steps: hanging a to-be-hoisted piece and a balance weight on the post-added steel structure interlayer construction tool; the to-be-hoisted part is hoisted to the elevation position of the floor where the later-added steel structure interlayer is located; the to-be-hoisted part is adjusted to the target installation position of the to-be-hoisted part, and the to-be-hoisted part is fixed and kept in a non-unhooking state; and the balance weight is lowered to the ground. Construction does not depend on an original main body structure, construction is convenient and fast, manpower is saved, efficiency is high, safety is high, and the application prospect is good.

    本发明公开了一种后增钢结构夹层施工工装及其应用方法,后增钢结构夹层施工工装包括延伸吊杆;延伸吊杆包括吊杆平衡配重部和吊杆内施工部,吊杆平衡配重部的自由端下侧设有平衡配重吊耳且平衡配重吊耳下挂设有用于吊装平衡配重的平衡配重电动葫芦,吊杆内施工部的自由端下侧设有内施工吊耳,待吊装件通过内施工吊绳挂在内施工吊耳上。应用方法:将待吊装件和平衡配重挂在后增钢结构夹层施工工装上;将待吊装件吊至后增钢结构夹层所在楼层标高处;将待吊装件调整至待吊装件目标安装位置,将待吊装件固定且待吊装件保持不脱钩状态;将平衡配重下放到地面。本发明不依靠原有主体结构施工,施工便捷,节省人力,效率高,安全性高,应用前景好。


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Post-added steel structure interlayer construction tool and application method thereof


    Weitere Titelangaben:

    一种后增钢结构夹层施工工装及其应用方法


    Beteiligte:
    ZHAO ZHONGLIN (Autor:in) / JIANG GUOMING (Autor:in) / WANG JUN (Autor:in) / LI PAN (Autor:in)

    Erscheinungsdatum :

    2024-01-02


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Chinesisch


    Klassifikation :

    IPC:    E04G SCAFFOLDING , Baugerüste / B66C Krane , CRANES / E04B Allgemeine Baukonstruktionen , GENERAL BUILDING CONSTRUCTIONS



    Complex steel structure high-altitude construction structure and construction method thereof

    WANG XIAOLIN / ZHANG MING / LI ZI'ANG et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Interlayer composite pressure-resistant shell and application thereof

    WANG JINGZE / CUI WEICHENG | Europäisches Patentamt | 2020

    Freier Zugriff

    Fabricated interlayer protection device of construction hoist and construction method

    HONG MENG / MENG XIAOBING / DING ZONGGEN et al. | Europäisches Patentamt | 2021

    Freier Zugriff

    Steel structure building elevator and construction method thereof

    HAN JUN | Europäisches Patentamt | 2022

    Freier Zugriff