A semi-submersible crane vessel for assembling a wind turbine and mounting the assembled wind turbine on a base by a crane of the vessel. At the assembly station, the hull of the vessel is provided with a tower accommodation well, preferably a well extending into or through a support column of the hull, sinking into or through the hull, the well being configured to accommodate therein at least a portion of a tower of the wind turbine during an assembly step of the wind turbine. For example, the tower containment well has a depth of at least 15 meters, e.g. At least 30 meters, measured from the deck of the deckbox structure.
一种半潜式起重机船舶,用于组装风力涡轮机并通过船舶的起重机将组装好的风力涡轮机安装在基座上。在组装台,船舶的船体设置有沉入或穿过船体的塔架容纳井,优选为延伸进入或穿过船体的支撑立柱的井,井配置为在风力涡轮机的组装步骤期间将风力涡轮机的塔架的至少一部分容纳在其中。例如,从甲板箱结构的甲板测量,塔架容纳井具有至少15米的深度,例如至少30米。
Assembling and installing wind turbine
组装并安装风力涡轮机
2023-08-22
Patent
Elektronische Ressource
Chinesisch
IPC: | B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS |
SHIP FOR INSTALLING OFFSHORE WIND TURBINE AND METHOD FOR INSTALLING OFFSHORE WIND TURBINE
Europäisches Patentamt | 2016