A passenger transport facility additionally arranged on a half-tunnel and half-bridge railway station aims to solve the technical problem that at present, a bridge-tunnel connected station and a passenger transport service facility can only be implemented synchronously and cannot be implemented by stages, influences on bridge and tunnel engineering in the station and engineering risks are reduced and controlled in the construction period, and the operation safety of the station after the passenger transport facility is additionally arranged is guaranteed. Comprising a platform bridge, a station entering and exiting longitudinal channel, a transverse channel, a tunnel side platform and a station building. The in-and-out longitudinal channel is arranged on the side, close to the arrival-departure line, of the station section main tunnel in parallel, the platform bridge is arranged on the outer side of the bridge on the same side, the station building is arranged outside the station section main tunnel, and the road is connected with the platform bridge, the in-and-out longitudinal channel and the station building outside the station section main tunnel. The tunnel side platform is located in the station section main tunnel and arranged above the main tunnel side ditch adjacent to the station entering and exiting longitudinal channel in an overhead mode. The transverse channels are arranged at intervals in the line direction and right face passenger train doors, one ends of the transverse channels communicate with the in-and-out longitudinal channels, and the other ends of the transverse channels communicate with the tunnel side platforms.

    一种半隧半桥铁路车站增设客运设施,以克服目前桥隧相连车站与客运服务设施只能同步实施不能分期实施的技术难题,在施工期间减少对车站内桥梁、隧道工程的影响,控制工程风险,且保证车站增加客运设施后的运营安全。包括站台桥、进出站纵向通道、横向通道、隧道侧边平台和站房。进出站纵向通道平行设置在车站段正洞邻近到发线一侧,站台桥于同侧设置在桥梁外侧,站房设置于车站段正洞外,道路在车站段正洞外连接站台桥、进出站纵向通道和站房。隧道侧边平台位于车站段正洞内,架空设置在邻近进出站纵向通道的正洞侧边沟上方。横向通道沿线路方向间隔设置,且正对旅客列车车门设置,一端与进出站纵向通道连通,另一端连通至隧道侧边平台。


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Passenger transport facility additionally arranged on half-tunnel and half-bridge railway station


    Weitere Titelangaben:

    一种半隧半桥铁路车站增设客运设施


    Beteiligte:
    WEN DONG (Autor:in) / ZHAO JIAKUI (Autor:in) / YIN YEBIN (Autor:in) / LI WUYI (Autor:in) / RAO WU (Autor:in) / GAO FENGNONG (Autor:in) / LUO XIAOPING (Autor:in) / ZHANG YING (Autor:in) / ZHOU JING (Autor:in) / PANG LU (Autor:in)

    Erscheinungsdatum :

    2023-01-10


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Chinesisch


    Klassifikation :

    IPC:    B61B RAILWAY SYSTEMS , Eisenbahnanlagen / E01D BRIDGES , Brücken / E21D SHAFTS , Schächte



    Medical aid unit additionally arranged in civil passenger cabin

    CUI ZHENYU / HU XIAOXIA / SUN DONG et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Economical elevator additionally arranged outside building

    ZHU MUSONG | Europäisches Patentamt | 2020

    Freier Zugriff

    Pit-free elevator additionally arranged on old building

    ZHANG TINGJIE / ZHANG TIANTIAN / JIANG MEI et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Additionally arranged brake pedal arrangement for motor vehicle

    WU ZEQIU | Europäisches Patentamt | 2020

    Freier Zugriff