This article presents a method of management of the initial spare parts supply. This generic problem is of particular interest in certain systems in which the difficulty of accessibility or the life cycle duration constitute risks tied to the possible depletion of the spare parts stock. In this paper we consider the spatial context. After having commented on the particularities of the management of the spare parts supply of a space station, we propose a method based on the minimization of the risk of postponement of a maintenance operation. Finally, an application to the Columbus laboratory of the International Space Station is presented.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Initial spare parts supply of an orbital system


    Beteiligte:

    Erschienen in:

    Erscheinungsdatum :

    2002-06-01


    Format / Umfang :

    11 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch


    Schlagwörter :


    Initial spare parts supply of an orbital system

    Pérès, François | Online Contents | 2002


    VESSEL SPARE PARTS MANAGEMENT SYSTEM, PROGRAM, AND VESSEL SPARE PARTS STORAGE STRUCTURE

    HATA JUNJI / FUKUI MASATO / YAMAGA NOBUYUKI et al. | Europäisches Patentamt | 2017

    Freier Zugriff

    Automotive spare parts

    Hatcher, J.S. | Engineering Index Backfile | 1944


    Spare Parts Trailer

    J. C. King | NTIS | 1968


    A BALANCED PERFORMANCE MEASUREMENT SYSTEM FOR AUTOMOTIVE SPARE PARTS SUPPLY CHAIN

    Zineb ACHETOUI / Charif MABROUKI / Ahmed MOUSRIJ | DOAJ | 2022

    Freier Zugriff