Highlights More lead-time reliability can paradoxically increase value-of-reliability (VOR). We investigate claims that this paradox explains inconsistent VOR estimates. We show that safety stock, alone, does not capture the true measure of VOR. More lead-time reliability will increase VOR, the paradox notwithstanding. Firms seeking high levels of product availability can safely ignore the paradox.

    Abstract The value-of-reliability (VOR) reflects the savings in inventory-system costs from more reliable (less variable) lead times. Previous studies have revealed that more reliable, but positively skewed, lead times could actually increase optimal safety inventory when the probability of satisfying all demand during a replenishment cycle drops below 70%. Researchers claim that this paradox affects most firms and that it explains the inconsistent VOR estimates found in the transportation economics literature. Our investigation reveals that firms interested in high product availability may safely ignore the paradox and that less lead-time variability consistently increases VOR, the paradox notwithstanding.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    The lead-time reliability paradox and inconsistent value-of-reliability estimates


    Beteiligte:
    Tyworth, John E. (Autor:in) / Saldanha, John (Autor:in)


    Erscheinungsdatum :

    2014-06-16


    Format / Umfang :

    10 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch







    The value of reliability

    Fosgerau, Mogens / Karlström, Anders | Elsevier | 2009


    The value of reliability

    Fosgerau, Mogens | Online Contents | 2010