Definition of locked-up stress; in failure of SS Schenectady, principal cause was accumulation of abnormal amount of internal stress locked into structure by processes of construction; in new ships, prevention of locked-up stresses should primarily be responsibility of structural designer. (See also Mar Eng and Shipg Rev v 48 n 8 Aug 1943 p 200-1, 224; Shipbldr and Mar Engine-Bldr v 50 n 411 Aug 1943 p 263-4; Welding J v 22 n 9 Sept 1943 p 721-3 (discussion) 723-4; Metal Progress v 44 n 3 Sept 1943 p 448, 468, 470; Mar Progress v 11 n 10 Oct 1943 p 60, 62, 64; Engineer v 176 n 4565 July 9 1943 p 28-9 (discussion) n 4566 July 16 p 52)
Fractures in welded ships
Shipbldg Shipg Rec
Shipbuilding and Shipping Record ; 62 , n 2
1943
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1943
|Engineering Index Backfile | 1943
|Engineering Index Backfile | 1943
|Engineering Index Backfile | 1943
|Engineering Index Backfile | 1943
|