Design of special 4-compartment 2-yd car used to transport concrete, in limited space, for lining short sections of Mono Craters tunnel on Los Angeles aqueduct; cost of welded car was $41.40.
Tunnel concrete car design
Western Construction News
Western Construction News ; 16 , n 3
1941
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete tunnel segments: from Channel Tunnel to the future
IuD Bahn | 2000
|Concrete tunnel lining by steam jet
Engineering Index Backfile | 1919
Rapid-Set Concrete Speeds Tunnel Repair
British Library Online Contents | 1995
Restore concrete tunnel lining by "Intrusion" process
Engineering Index Backfile | 1939
|Business tunnel defect treatment concrete operation train
Europäisches Patentamt | 2023
|