Basic considerations in handling of materials; handling time costs money and should be reduced to minimum; parts and components should be made to travel direct from operator to operator; where elevators are used, collecting stations should be established to cut down small loads; gravity should be used, it is economical; work should flow, where practicable, towards despatch.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Time and motion study


    Weitere Titelangaben:

    Automobile Engr


    Beteiligte:
    Hendry, J.W. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1945


    Format / Umfang :

    3 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Time and motion study

    Hendry, J.W. | Engineering Index Backfile | 1945


    Time and motion study

    Hendry, J.W. | Engineering Index Backfile | 1945


    Time and motion study

    Hendry, J.W. | Engineering Index Backfile | 1945


    Time and motion study

    Hendry, J.W. | Engineering Index Backfile | 1945


    Time and motion study

    Hendry, J.W. | Engineering Index Backfile | 1945