Prototype train composed of three flat cars with lowered floors, each with floor length of 43 ft 3 in., built by Societe Nouvelle des Ateliers de Venissieux, in France; designed to carry loaded trucks and semitrailers over long distances with max weight of 26 tons; light alloy cars can travel at high speed on international railway system.
Quand les camions prennent le train
Quand les camions prennent le train
Revue de l'Aluminium ; 33 , n 235
1956
6 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Quand les autorails prennent le maquis
Online Contents | 1994
Gastronomie - Quand les légumes prennent le TGV
Online Contents | 2005
Pourquoi les chars prennent le train
Online Contents | 1996
La vie des associations - Autobiographie. Quand les cheminots prennent la plume
Online Contents | 2011
Fourvière se ferme aux camions
Online Contents | 1997