Structure of 200-car Tower Parking garage in Columbus, Ohio, rises 88 ft above street level; garage has 14 parking levels and all but basement were raised as lift slabs from stacked position on basement floor; elevators in central corridor divide building; two separate lift slabs which comprise each level, are tied together at each end of garage with horizontal steel struts.
Height record goes up again for lift-slabs in U S
Eng News-Rec
Engineering News-Record ; 161 , n 1
1958
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.