Rock fill dam, closing 40 ft gorge through which Palisade Lake at City of Vancouver discharges was accessible only by air; material transport was performed by helicopter, capable of lifting 400 lb; 35, 000 lb were transported during two mo of 1948 at cost of 10.85¢ per lb or $80 per flying hr; during four mo of 1949 total of 305,000 lb were transported at cost of 5.5¢ per lb or $ 60 per hr.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Helicopter delivers material for small dam at rough site


    Weitere Titelangaben:

    Western Construction News


    Erschienen in:

    Erscheinungsdatum :

    1950


    Format / Umfang :

    3 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :