Conversion of Pietermaritzburg-Glencoe section; complete electric system consists of 33,000-kw power station at Colenso, generating 3-phase, 50-cycle, 6600-v current; 88,000-v transmission system, 12 substations converting high-tension current to d-c line voltage of 3000; overhead contact line; locomotives; later Natal conversions.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    South African railways electrification


    Weitere Titelangaben:

    Elec Ry Traction (Supp Ry Gaz)



    Erscheinungsdatum :

    1934


    Format / Umfang :

    5 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    South African railways electrification

    Engineering Index Backfile | 1926


    Electrification of the South African railways

    Thayer, Robert E. | Engineering Index Backfile | 1919