Scheme involves construction of some 37 mi. of road; difficulties of drainage which have been met with; level of road varies from 600 to 1750 ft. above sea level; gradient is nowhere greater than 1 in 15; difficulties encountered in construction.
Glamorgan inter-valley roads
Road Road Construction
Roads and Road Construction ; 6 , n 63
1928
4 pages
10 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1998
|Voucher Parking: is it the answer in South Glamorgan?
Online Contents | 1993
|Book Reviews - Ordeal by Exocet: HMS Glamorgan and the Falklands War, 1982
Online Contents | 2006
|Quality Transport for the New Planning Environment, the West Glamorgan Experience
British Library Online Contents | 1995
|Main travelled roads : 6 Mississippi Valley stories
TIBKAT | 1965
|