Number of Soviet "auto-opera-tors" are discussed; it is proposed that simpler optimizers for only 3 variables be designed for control of hydroelectric power plants, where selection of optimum number of operating sets can be done much more easily than for thermal plants. (See also Elektrichestvo n 8 Aug 1963 p 18-21)
Selection of optimum number of sets operating at hydroelectric power station and principles of design of optimizer
Vybor optimal'nogo chisla rabotayushchikh agregatov na gidrostantsii i printsipy postroeniya avtooperatora
1963
9 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Operating characteristics of hydroelectric generating sets
Online Contents | 1999
|Hydroelectric power station internal transportation equipment
Europäisches Patentamt | 2021
|Komaki power station of Shogawa Hydroelectric Co.
Engineering Index Backfile | 1931
|Radar station operating principles
Tema Archiv | 1973
|Vulcan Street Hydroelectric Central Station: World's First Hydroelectric Plant
British Library Online Contents | 1996