This article is a continuation of the Authors’ study on the ways to ensure the quality and safety of aeronautical data and information. This time, however, the legal requirements for aeronautical data and information were briefly described and then the concept of purpose and scope of Shewhart control charts’ implementation, presented in [2], was broadened and it was proposed to refer the calculated upper (GLK) and lower (DLK) control limits to the requirements set out in the legal specification including in particular the accuracy values out of the Harmonised List from the Eurocontrol Specification [13]. In order to illustrate the proposed modification, an example of such a card for the measured aeronautical obstacles was presented, considering two cases: that these obstacles are located in Area 3 and in Area 2. Analysed issues will be the subject of Authors’ further study.
The Concept of a Method Improving the Process of Aeronautical Geospatial Data Creation
2018
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Concept car - Icona Fuselage, aeronautical inspiration
Online Contents | 2011
|Concept car - Bertone Slim, aeronautical inspiration
Online Contents | 2000
|A concept for an aeronautical machine
NTRS | 1965
|