In underground mining of solid minerals becoming increasingly common development system with stowing hardening mixtures. In this case the natural ore array after it is replaced by an artificial excavation of solidified filling mixture consisting of binder, aggregates and water. Such a mixture is prepared on the surface on special stowing complexes and transported underground at special stowing pipelines. However, it is transported to the horizons of a few kilometers, which requires a sustainable mode of motion of such a mixture in the pipeline. Hardening stowing mixture changes its rheological characteristics over time, which complicates the calculation of the parameters of pipeline transportation. The article suggests a method of determining the initial parameters of such mixtures: the status coefficient, indicator of transportability, coefficient of hydrodynamic resistance to motion of the mixture. These indicators characterize the mixture in terms of the possibility to transport it through pipes. On the basis of these indicators is proposed methodology for calculating the parameters of pipeline transport hardening filling mixtures in drift mode when traffic on the horizontal part of the mixture under pressure column of the mixture in the vertical part of the backfill of the pipeline. This technique allows stable operation is guaranteed to provide pipeline transportation.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    GRAVITY PIPELINE TRANSPORT FOR HARDENING FILLING MIXTURES


    Beteiligte:


    Erscheinungsdatum :

    2015



    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Unbekannt




    Pipeline device for automatic filling of rocket propellants

    DUN XIANGMING / HUANG YUE / JIANG ZAN et al. | Europäisches Patentamt | 2021

    Freier Zugriff

    PIPELINE TRANSPORT

    KIM KONSTANTIN KONSTANTINOVICH / KOLESOVA ANNA VLADIMIROVNA | Europäisches Patentamt | 2020

    Freier Zugriff

    Filling type gravity anchor and construction method

    GAO ZHIZHAO / SUN JINGJUN / YU LEI | Europäisches Patentamt | 2023

    Freier Zugriff

    Aircraft hatch filling pipeline air suction separation device

    ZHU XIAOHUA / LYU JIWEI / KONG XIANGSHUAI et al. | Europäisches Patentamt | 2020

    Freier Zugriff

    Novel ultra-deep open-hole filling pipeline installation method

    YANG ZHIYONG / YU SHAOJIANG / CHA QIANGHUA et al. | Europäisches Patentamt | 2023

    Freier Zugriff