This contribution in a cross section way focused on the analytical determination of practical capacity of main tracks and the issue of the required capacity in the context of the comparison of national methodology used by the ŽSR and the recommended international UIC methodology. Methodology for the calculation of permeable performance within the national conditions is stipulated by ŽSR´s regulation – D24, the methodology within the international conditions for members of the UIC railway union is recommended by UIC Code 406. Both of presented methodologies have their pros and cons, which are consistently derived from this text.
Capacity of Main Railway Lines – Analysis of Methodologies for its Calculation
2018
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
capacity , methodology , timetable , reserve , capacity consumption , Naval Science , V
Metadata by DOAJ is licensed under CC BY-SA 1.0
Electrification of railway main lines
Engineering Index Backfile | 1931
|A railway capacity determination model and rail access charging methodologies
Online Contents | 2005
|A railway capacity determination model and rail access charging methodologies
Taylor & Francis Verlag | 2005
|Electric traction on the main railway lines of Switzerland
Engineering Index Backfile | 1901
|Study on Speed-Up of China Railway Main Lines
ASCE | 2002
|