In the continuous airworthiness stage of civil aircraft,risk assessment needs to be carried out to ensure that the operation safety level can be maintained within an acceptable range.Based on the transport aircraft risk assessment method(TARAM)and the risk criteria,by considering different crack sizes,the calculation method of fleet risk value is given in this paper according to the fleet fault number,critical crack and characteristic life.Taking the fatigue crack of the fuselage supercharging boundary structure as an example for ongoing safety risk assessment,the risk level of the event,and the time limit of corrective action implementation are calculated.And the implemen-tation time limit of corrective measures is validated by individual risk within time limit using corrective actions.Results show that the individual risk is below the risk threshold.It can be concluded that the corrective measures and implementation time limit formulated in this article can meet the continuous safety requirements of the fleet and thus ensure the safe operation of the fleet.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Continuous Operational Safety Assessment of Civil Aircraft Structural Events Based on TARAM


    Beteiligte:
    JIA Baohui (Autor:in) / MA Yuwei (Autor:in) / WANG Zhuo (Autor:in) / WANG Yiqiang (Autor:in)


    Erscheinungsdatum :

    2021




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Unbekannt




    Airworthiness Safety Construction of Civil Aircraft Based on Operational Data

    Guo, Yuanyuan / Sun, Youchao / Li, Longbiao | British Library Conference Proceedings | 2019


    Airworthiness Safety Construction of Civil Aircraft Based on Operational Data

    Guo, Yuanyuan / Sun, Youchao / Li, Longbiao | Springer Verlag | 2018



    Safety and civil aircraft

    Tye, W. | Engineering Index Backfile | 1951


    Safety and civil aircraft

    Tye, W. | Engineering Index Backfile | 1951