At present, ground service vehicle scheduling at most airports in China is still in the stage of manual management. The efficiency of this scheduling method is low, and it easily leads to flight delays. Kunming Changshui International Airport is used in this paper as a prototype. The ferry vehicle scheduling model is established with the objectives of: minimization of the total vehicle number, minimization of the total mileage of the vehicle, and the minimization of the difference in the workload between vehicles. Then we designed a two-stage algorithm for the scheduling problem, based on a heuristic algorithm. The empirical results show that the scheduling scheme can implement intelligent scheduling of airport ferry buses, effectively reduce the number of vehicles required, and the total mileage of vehicles, improve the equilibrium of vehicle workloads, and reduce the cost of ground services.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Modeling and Heuristic Algorithm of Ground Ferry Vehicle Scheduling in Large Airports


    Beteiligte:
    Liu, Yi (Autor:in) / Zhang, Jun (Autor:in) / Ding, Cong (Autor:in) / Bi, Jun (Autor:in)

    Kongress:

    19th COTA International Conference of Transportation Professionals ; 2019 ; Nanjing, China


    Erschienen in:

    CICTP 2019 ; 159-170


    Erscheinungsdatum :

    2019-07-02




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    A variable neighborhood search algorithm for airport ferry vehicle scheduling problem

    Lv, Lingling / Deng, Zhiyun / Shao, Chenyang et al. | Elsevier | 2023


    AIRPORTS: GROUND SUPPORT EQUIPMENT.

    Ray, Lisa H. | Online Contents | 1994


    Airport competition – Regional airports losing ground to main airports

    Lian, Jon Inge / Rønnevik, Joachim | Elsevier | 2009


    AIRPORTS - GROUND-SUPPORT EQUIPMENT

    Young, Kathryn M. | Online Contents | 1998


    Ferry vehicle scheduling method and device and electronic equipment

    HU YANYU / LI XUENAN / HU SHAODONG et al. | Europäisches Patentamt | 2024

    Freier Zugriff