In this study, main problems existing in previous operation are discovered by analyzing the development of comprehensive passenger transport hub facilities both at home and abroad. According to China's actual conditions, this study classifies the main facilities of comprehensive passenger transport hub, specifies the functions of each part and combines with existing method of hub facilities deployment, finally puts forward the scale calculation methods of all parts of hub facilities by summarizing the problems of existing comprehensive passenger transport hubs.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Scale Calculation Method Study of Comprehensive Passenger Transport Hub Facilities


    Beteiligte:
    Liu, Yugang (Autor:in) / Luo, Xia (Autor:in) / Cheng, Fanghong (Autor:in)

    Kongress:

    Second International Conference on Transportation Engineering ; 2009 ; Southwest Jiaotong University, Chengdu, China



    Erscheinungsdatum :

    2009-07-29




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Scale Calculation Method Study of Comprehensive Passenger Transport Hub Facilities

    Liu, Y. / Luo, X. / Cheng, F. et al. | British Library Conference Proceedings | 2009



    Scale-Measurement Methods on Transfer Facilities for Comprehensive Passenger Transport Hub Based on the Service Level

    Shi, B. / Wang, J. / Jiang, C. et al. | British Library Conference Proceedings | 2009


    PASSENGER DOOR WITH LINEAR GUIDE FOR PUBLIC PASSENGER TRANSPORT FACILITIES

    PELLEGRINI ANDREAS / AREND UL RIKH | Europäisches Patentamt | 2015

    Freier Zugriff

    Passenger facilities

    Online Contents | 1995