Highway-Rail Quad Gate Operation Time by System Simulation of Dynamic Dilemma Zone
JOURNAL OF TRANSPORTATION ENGINEERING ; 129 ; 253-261
2003-01-01
9 pages
Aufsatz (Zeitschrift)
Englisch
DDC: | 629.04 |
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Highway-Rail Quad Gate Operation Time by System Simulation of Dynamic Dilemma Zone
Online Contents | 2003
|British Library Conference Proceedings | 2000
|Highway Rail Grade Crossing 4 Quad Gates
British Library Conference Proceedings | 2000
|Dynamic dilemma zone based on driver behavior and car-following model at highway-rail intersections
Online Contents | 2003
|